Three-phase power.
Single-phase is what most houses have and it runs most things. Some things it doesn't: big welders, compressors, cool rooms, large pumps, machinery with motors above a few kilowatts. Kayden installs three-phase circuits, outlets and boards where a property already has three-phase supply, and tells you straight if it doesn't.

In short
Three-phase power runs equipment single-phase can't: large welders, air compressors, cool rooms and big pumps. We install three-phase circuits, outlets and boards on properties around Dungog, Gresford and the Hunter that already have three-phase supply.
- Licence
- NSW 403289C
- Based
- Dungog
- Quotes
- Free, price agreed first
- Certificate
- Lodged for every job
If the property only has single-phase coming in, getting three-phase means an application to the network provider and sometimes a new service. Kayden can scope it, tell you what's involved and handle the electrical side once the supply is there.
What the job involves
- Three-phase sub-mains and distribution boards
- Three-phase outlets and isolators for welders, compressors and machinery
- Motor circuits with the right protection
- Balancing loads across phases so one isn't doing all the work
- Checking whether your existing supply can carry what you're planning
When you need it
- A new machine, compressor or cool room needs a three-phase plug
- Single-phase equipment is struggling or tripping under load
- You're building a workshop and want it done once
What changes the price
- Whether three-phase is already at the property
- Distance from the main board to where you need it
- The number of outlets and the size of the machinery
- Any board upgrade needed to carry the extra circuits
What NSW requires
- Three-phase equipment needs proper isolation and protection matched to the load
- Supply changes at the street or meter involve the network provider, and network-side work is restricted to Accredited Service Providers. Kayden can tell you the parts he can and can't do
- A Certificate of Compliance covers the installation
What Kayden needs from you to quote
- A photo of your meter box and main switchboard
- The nameplate of the machinery you want to run
- Where it's going
Questions about three-phase power
How do I know if my property has three-phase power?
Look in the meter box: three-phase usually has three main fuses or a three-pole main switch instead of one. The easiest way is to text Kayden a photo of the meter box and switchboard and he'll tell you.
What needs three-phase?
Large welders, air compressors, cool rooms, big pumps and workshop machinery with larger motors. Most household appliances run fine on single-phase.
Can you add three-phase if I only have single-phase?
The supply upgrade needs an application to the network provider, and network-side work has to be done by an Accredited Service Provider. Kayden can tell you the parts he can and can't do, and explain the steps.
Where Kayden does this
Three-phase power across the district
Based in Dungog and working across these places. If you’re between them, or further out, call and ask.
Other work Kayden does
Get in touch
Request a free quote
Tell Kayden what needs doing and where. He’ll call or text you back to talk it through. No obligation.
- 0418 282 806Quickest. Just call
- Text a photoBoard, shed or the problem. Same number
- aeleccontract@outlook.comPlans and paperwork
- 7am to 5pm. After-hours and emergency calls by phone.
Need an electrician in the Hunter?
One call to Kayden and it’s sorted. Licensed, insured and local to Dungog.
Or text a photo of the job to 0418 282 806.